Construction scheduling software

CPM construction scheduling software, next to the estimate

BidSync AI includes CPM scheduling for general contractors and every self-perform trade: FS, SS, FF and SF links, lag, constraints, critical path, total float, working calendars and resources, plus a Gantt chart, baselines, a 3-week lookahead and a 4D scheduler. The schedule sits in the same app as takeoff, estimating, field records and job cost.

Master Schedule: the task list on the left and the Gantt chart on the right.

What's included

CPM network

Link tasks finish-to-start, start-to-start, finish-to-finish or start-to-finish, with lag on any link.

Critical path and total float

The engine calculates early and late dates, total float and the critical path from the links you draw.

Constraints and working calendars

Set date constraints on a task and schedule on a working-day calendar with holidays instead of straight calendar days.

Gantt chart and baselines

See the plan as a Gantt chart, set a baseline, and compare the current schedule against it.

3-week lookahead

A short-interval view of the next three weeks for the foreman meeting, drawn from the same tasks as the master schedule.

4D scheduler

Play the schedule forward in time against planned cost, with an S-curve and what is working on any given day.

Resources and crews

Assign labor, equipment, material and subcontractors to tasks, assign a crew from your crew list, and see loading in a resource heatmap.

Start from the estimate

Bring bid items from the estimate, or from your master library, into the schedule as tasks, so the plan starts from the scope you priced.

Milestones and analytics

A milestone calendar and schedule analytics on progress against the plan.

AI schedule-risk forecast

An AI review flags tasks that look at risk and estimates the delay. A person decides what to do about them.

Crew and equipment scheduling

An operations schedule and a resource scheduler show crews and equipment across projects.

Who it fits

  • General contractors and self-perform trades that build and update their own schedules
  • Estimators and project managers who want the schedule to start from the bid items they already priced
  • Superintendents and foremen who run the job from a 3-week lookahead

Frequently asked questions

What is CPM scheduling in construction?

Critical path method scheduling links tasks by their logic, then calculates the longest chain of dependent work. That chain is the critical path. A task on it has no float, so a day lost there is a day lost on the job.

Can BidSync AI replace Primavera P6 or Microsoft Project?

BidSync AI is a CPM scheduling replacement for contractors who want the schedule in the same system as the estimate and the job record. Tasks come in from the estimate with their resources, and the schedule carries FS, SS, FF and SF links, constraints, calendars, baselines and total float.

Does it include a 3-week lookahead?

Yes. The lookahead shows the next three weeks of tasks, drawn from the master schedule.

Is the AI schedule-risk forecast a prediction I can rely on?

No. It is a review aid that flags tasks for a scheduler to look at. The scheduler owns the dates.

Is scheduling a separate product?

No. Scheduling is part of the same seat as estimating and project management. Year 1 is $550.42 per seat per month, all-inclusive: the full platform plus setup, training and implementation, with no upfront fee. From year 2 the seat drops to a $320 per month loyalty rate. More than 10 seats is custom pricing. Annual increases are in the pricing terms.

See BidSync AI on a project like yours

Book a 30-minute sandbox walkthrough. Bring a current bid and we'll show you how a draft takeoff moves from invite to final payment after your estimator checks it.